Precision and efficiency in installation are paramount for PV projects deployed across challenging landscapes. Our newly released video provides an in-depth look at the complete installation process of an innovative flexible support system.
This solution is engineered for irregular terrains such as mountains, hills, deserts, and ponds, making it suitable for diverse applications including sewage treatment plants, agri-photovoltaic, and fishery-solar hybrid projects. The core cable-truss structure ensures superior wind resistance, underpinning the long-term reliability of the installation.
Steps:
1. Precise foundation casting & embedding
2. Oriented installation of side columns
3. Assembling brace rods & steel strand cross-ties
4. Installing pre-fabricated middle columns & bracing tubes
5. Configuring bracing rods & cross-ties for middle columns
6. Securing bottom beams at end anchor piles
7. Connecting anchoring threaded steel rods
8. Laying main steel strands
9. Fastening with U-bolts and strand tensioning
10. Secure mounting of PV modules